Pre-Bid Engineering for Ratna MOPU has been carried out successfully for its client. A 4 Leg new build option as well as 3 leg MODU to MOPU conversion options were worked out. The following documentation were generated for the project.

  • General Arrangement Drawings
  • Scantling Drawings
  • P & IDs
  • Fire & Safety Plans
  • Design Philosophies
  • In-place & Fatigue Analyses
  • Stability and Motion Analyses
  • RFQs for Mechanical, Piping, Electrical and Instrumentation Equipment
  • Bulk MTOs